Our old family home of 8 years has been demolished. This was not without its dramas, the demolition people found asbestos in the slab ($8k more), and then broke a sewer pipe and refused to pay for it. The joys of building I guess, hopefully we won't have too many more issues (she says hopefully).
We then had the excavation guy in to prepare the block for the pool. The site had a lot of sandstone in the back, we are going to put the pool there so a lot of excavation was needed.
We handed the site over to Metricon on the 31st July in order to avoid a price increase of $8k (3 months after contract signing). After some to-ing and fro-ing, Metricon decided to issue a "stop work" notice and let the pool company finish the shell. A much better solution, as then the pool can be built and the house can start without further interruptions. Pool guys should be on site tomorrow.
Photos of the demolition and excavation:
Asbestos in the bathroom slab
Excavators hard at work!
The site is cleared! Looks massive
A giant playground for the kids!